The project is a bridge with a total length of 1,125 meters, and the main bridge is a single-span under-bearing steel box tied arch bridge with a span layout of 170 meters.
With the vigorous development of the wind power industry, from the offshore area with high wind speed to the inland area with low wind speed
Our company mainly supplies prestressed steel strands for prefabrication of concrete bridges and stay cables for cable-stayed bridge short towers in this project.
By communication with customers, we learned that was mainly used in the wharf construction. Customers have payed more attention to this purchase.
The customer communicated with our production department during the design processing, hoping to optimize the best cost and ensure the technical requirements.
Kuo Mari cable-stayed bridge is located in Tongren County Kuo Mari Road across the Longwu River, is the county in the north of the ring secondary trunk road.
Pre-stressing Steel bars, in compliance with prEN-10138-2: 2000,
high-carbon, smooth,cut to length, in packages with weight approx.1250kg with maritime package;
In the first quarter of 2022,we participated in supplying piling pipes for South American Coastal Terminal. The project is including large-diameter spiral long tube with a maximum length of 40 meter for each piece and requires Hempel coating to cover part of the tubes. The entire production was carried out under the supervision of the customer engineers. After several months of orderly production, the company finally passed the various tests and released the goods.